When the shredder is working, due to its own environmental impact, it is inevitable that many degrees of failure will occur in many cases, but most of the faults can be easily solved.
However, if we do not pay attention to these glitch, if we do not solve it in time, if it continues for a long time, it will definitely cause serious damage to the shredder, waste money and waste time, and delay work efficiency and energy.
If we find abnormal noise in the metal shredder during use, first of all, it is necessary to check whether the shaft of the equipment cavity is damaged. If not, it may be too little butter, which causes the friction between the shaft and the gear to increase. Loud, this kind of glitch needs to be found and solved in time to avoid serious problems. It is necessary to regularly add butter to the shaft to prevent damage to the shaft.
If we find that the shredder shreds the material in the production process, it should be stopped immediately. This situation is likely to be caused by the long time tearing the hardness material and the gap between the inner cutters becomes larger. This type of failure is also a normal loss phenomenon. If we check that the cutter head is not worn and does not need to be replaced, just adjust the gap between the blades.