1. plastic shredder machine motor, reducer, hydraulic coupling, head, tail and other parts must be complete, intact and fastened. Reducer and hydraulic shaft joints shall be free of oil leakage and oil leakage, and the amount of oil shall be appropriate.
2. the signal must be sensitive and reliable. The spray sprinkler must be intact.
3. The power cables and operating wires must be neatly hung without being squeezed;
4. The coal, vermiculite, sundries, and motor and reducer coal dust near the nose must be cleaned up;
5. the overlap of the working surface scraper conveyor head and the transfer machine tail should be appropriate;
6. The tightness of the scraper chain should be moderate, and the scraper and screws must be fully tightened;
7. The trolley of the transfer machine must be stable and reliable;
8. When the bridge body of the reprinter is turned on in some cases, the operation of each part should be free of abnormal sounds, and the scraper, chain, and connecting ring should be free of twist, twist, twist and deformation;
9. the roadway support at the plastic shredder machine must be intact and firm.
10.The safety protection net and protection device of plastic shredder machine must ensure no deformation, no failure, and safety and reliability;
11. The roadway support at the plastic shredder machine must be intact and firm.