After the entire set of shredder machine equipment arrived at the project site, Yuxi Machinery Environmental Protection dispatched professional and technical personnel for the first time to carry out equipment installation and commissioning work. In less than a week, Yuxi Machinery Environmental completed the installation and commissioning of the entire project, and passed the acceptance inspection at one time.
In the acceptance of the shredder machine project, the customer carefully inspected the equipment of the Yuxi Machinery Large-size Waste Disposal System, and conducted a professional evaluation from the appearance of the shredder machine to the commissioning operation. After a series of inspections and assessments, the inspectors agreed that the equipment was of good quality, in good operating condition, in line with industry norms and related standards, agreed to pass the inspection, and gave a high evaluation and approval to the services of the Yuxi team.
Yuxi machinery large-size waste shredder machine production line crushing treatment adopts intelligent and mechanized assembly line operation. The shredder machine crushes and processes 20-40 cubic meters of large-scale waste per hour, and can complete a waste sofa in tens of seconds. After shredding and sorting these large pieces of garbage, it can not only reduce the pollution and beautify the city appearance, but also reuse the waste. At the same time, it can also greatly eliminate the safety hazards caused by the random disposal of large-scale garbage.
In the next step, Yuxi Machinery Environmental Protection will summarize the project construction experience in depth, continue to improve the service standard system in accordance with the principle of “active exploration, gradual progress, continuous improvement, and continuous improvement”, and strive to create more national large-scale waste disposal demonstration projects.