Service Tel:+86-371-53762053
Tel/whatsapp/wechat:+86-13674998188 (24 hours online)
E-mail:
zhengzhouyuxi@yuximachine.com
Add:Economic And Technological Development Zone, Zhengzhou, Henan, China (Mainland)
1. Check and replace all the cutter bodies of the dual-shaft shredder, repair or replace the broken cutters. When installing new cutters, care should be taken to ensure that the cutters, bushings, and spindles are accurately installed without gaps, and at the same time, avoid cutters Collide with each other to prevent bumps.
2. When repairing or replacing the two-roller shaft, the welded shaft journal can be surfacing welded. When installing the two rollers, pay attention to make the center lines of the two rollers parallel, and the non-parallel tolerance is 0.3 mm per meter, and ensure that the force on both sides of the roller is uniform.
3. Replace the large and small gears and the transmission shaft. If the large and small gears are not turned over, they can also be turned over after replacement. As spare parts for the next repair, make a record during inspection.
4. Check the bearing, coupling, reducer structure, reducer belt and other problems, deal with hidden dangers