Shredder manufacturer tells about the steps of shredder installation test
1. The waste shredder equipment should be installed on a horizontal concrete foundation and fixed with anchor bolts;
2. When installing, pay attention to the vertical of the main body and the horizontal;
3. Configure the power cord and control switch according to the power of the device;
4. After installation, check whether the bolts of each part are loose and whether the door of the host machine is tightened. If so, please tighten it;
5. After the inspection is completed, carry out an empty load test run, and the test run is normal and production can be carried out.